METALROOFINGINSTALLATIONGUIDECF PANELMANUAL
10PRODUCT DESCRIPTION• 12" Coverage• 26 GaugeFor color selections,please request a color chart.Galvalume Plus (20 Yr. WARRANTY)Limited Paint Warr
Details are subject to change without prior notice.11STANDARD FASTENER LOCATIONS AT PANELWARNING! Mueller trim comeswith a protective film coating toa
RECOMMENDED SCREW PLACEMENT TABLEDetails are subject to change without prior notice.Note: If using treated lumber, special corrosive resistant screws
INSTALLATION12"Oil Canning Reduction Trim on CF PanelOIL CANNINGWhat is Oil Canning?Oil canning is described as a wavy appearance oftenoccurring
14Details are subject to change without prior notice.DETAIL LOCATOR147283596DETAIL SECTION Page1 Eave . . . . . . . . . . . . . . . . . . . . . .152 G
1. Install the eave trim by sliding it underneath the underlayment and securing it to the roof surface withwafer head screws on 5’ centers.2. There ar
16STANDARD EAVE TRIM INSTALLATION WITH GUTTERDetails are subject to change without prior notice.1. Install the eave trim to the substrate with wafer h
1. Starting at the corner, install the adjustable gable trim along the sloping gable,placing it on top of the underlayment.2. Attach with wafer head s
18STARTING AND ENDING PANEL INSTALLATIONDetails are subject to change without prior notice.Starting Panel1. Apply adjustable strip as previously instr
19HIGH SIDE RESIDENTIAL EAVE TRIM INSTALLATIONDetails are subject to change without prior notice.1. Attach the high side trim (#0803) to the fascia wi
TABLE OF CONTENTS2Preparation Requirements and Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Safety Considerations . . . .
20VALLEY PANEL AND TRIM INSTALLATIONDetails are subject to change without prior notice.1. Start at the low end, trim and place the valley flashing. Th
STANDARD RIDGE ROLL and HIP INSTALLATIONDetails are subject to change without prior notice.1. Lay a piece of the #0221 ridge roll or hip in position,
22ENDWALL TO ROOF FLASHING INSTALLATIONDetails are subject to change without prior notice.1. Insert the endwall flashing (#0725) behind the existing w
1. Apply butyl tape to the bottom side of the J-closure.2. Install the J-closure flush with the outer edge of the sidewall flashing and parallel to th
1. Apply lower panels.2. Install the transition flashing (#1487) making sure the bottom portion of the flashing is at the same pitchas the lower panel
1. Ensure the lower panel is installed completely (except for the top fasteners).2. Using duckbill pliers squeeze the top 10” of the male side of the
The uphill flashing will be 4” wider than the width of thecurb (2” on each side). Cut an 1/8” slot in the two uphillcorners of the panel slightly wide
27CHIMNEY INSTALLATIONDetails are subject to change without prior notice.CHIMNEY FLASHING - SIDEFLASHING - VENTProcedures:1. Trim the opening in the f
Mueller’s #1, 26 gauge, CF Panelshave received the Underwriter’sLaboratory UL2218 ApprovedClass 4 Premium RatingM-CFMANUAL-REV.11/12FIND OUT MORE ABOU
This detail & installation manual has been provided to serve as a basic guideline for installing the Mueller CF panel roof system.This manual shou
As with all major construction projects, safety should be a primary concern. The erector or contractor should be surethat all OSHA safety rules are fo
Delivery: Mueller takes every precaution to ensure that material is delivered to the customer damage-free and fully protected fromthe elements during
6STORAGEStorage: It is recommended that sheets be kept coveredand out of the elements if at all possible. If sheets are tobe stored outside, the follo
7STANDARD PARTSDetails are subject to change without prior notice.Note: If using treated lumber, specialcorrosive resistant screws are required.Ask yo
STANDARD PARTS8
9STANDARD PARTS