STORAGE
Storage: I
t is recommended that sheets be kept covered
a
nd out of the elements if at all possible. If sheets are to
b
e stored outside, the following precautions should be
observed:
1. The storage area should be reasonably level, and
located so as to minimize handling.
2. When stored on bare ground, place plastic ground
cover under the bundles to minimize condensation
on the sheets from ground moisture.
3. Store bundles at least 12 inches above ground level
to allow air circulation beneath the bundle, and to
prevent damage from rising water.
4. Elevate one end of each bundle slightly to permit
runoff of moisture from the top of the bundle or
from between sheets. A waterproof cover should be
placed loosely over the bundles to allow for air
circulation under the cover.
5. Inspect stored bundles daily and repair any tears
or punctures in the waterproof cover.
6. Re-cover opened bundles at the end of each work
day to prevent subsequent moisture damage.
Checking order at time of delivery:
C
heck each order carefully, as it is unloaded. Report any
o
bvious damage or shortages to the carrier immediately. If
damage or shortages are noted after delivery (at time of
unpacking) notify your Mueller representative immediate-
ly. Have invoice numbers and detailed descriptions of the
damage or shortage available. These procedures are for
your protection. A shortage or damage discovered later
can be caused by theft, misplacement, mishandling or
other causes and is not the responsibility of Mueller, Inc.
Underlayment: The underlayment should be one layer
of Titanium or 30# felt. The Titanium should have a 2"
side lap and a 6” end lap. The underlayment should be
fastened to the deck with galvanized roofing nails
with tin caps 12" on center in the field and 6" on
center at the sidelaps.
TOOLS REQUIRED
The following list of tools is recommended when installing metal roofing:
1. Aviation snips - left, right, straight 6. Square 11. Broom 16. Fire extinguisher
2. Screw gun 2500 RPM with appropriate nut drivers 7. Straight edge 12. Extension cords 17. Saw horses
3. Tape measure 8. Chalk line 13. Ladder 18. First aid kit
4. Caulking gun 9. Vise grips 14. Hammer 19. Tarp
5. Safety equipment: goggles, hard hat, 10. Gloves 15. Drill bits 20. Electric shear or nibbler
and soft rubber soled shoes
CAUTION: Whenever using any type of power equipment, it is important to follow the manufacturer’s recommendation
for use. Always be aware of the danger involved when using electric or air powered equipment.
Never Install Material if the Quality is in Question!